Circle Square, Manchester
Circle Square is a £750 million development on the site of the former BBC building in Manchester. It is being constructed as a new city centre neighbourhood in the heart of Manchester’s Oxford Road district, and will take eight years to complete.
Circle Square is being delivered over three phases and once fully finished, will include over 1,200 homes - both serviced apartments and private residential accommodation, more than 500,000 sq ft of offices, a 158 bedroom hotel, shops, restaurants, bars and more. Within this, 683 apartments are being built for Affinity Living across two 37-storey and 17-storey buildings. Two thirds of the scheme will be complete by 2020.
MPB Structures was selected by John Sisk & Son as the construction partner to deliver groundworks, reinforced concrete sub and superstructure packages on several buildings in the first phase of the commercial development at Circle Square.
- Customer Name
- MPB Structures
- Sector
- Construction
THE CHALLENGE
During the slipform phase, MPB Structures needed a hoisting solution to enable operatives to get into the slipform rig in the safest manner possible. This was required on three core structures - buildings 2, 4 and 6 - with a requirement to reach 60m, 80m and 115m high.
THE SOLUTION
Our specialist hoists team provided a total of three twin passenger and goods hoists to facilitate construction of the cores through the slipforming process. The model provided was the twin Alimak 12/30 passenger and goods hoist which has a payload capacity of 1,200kg and the ability to transport up to 15 people at a time at a speed of 40m/min. As the Alimak 12/30 hoist has a maximum lifting height of 150m, it was easily able to reach the heights required for this project.
THE RESULTS
The hoists we provided enabled the safe transportation of workers and materials during the slipforming phase of this landmark project which will create a whole new urban neighbourhood in Manchester. The hoists were progressively installed and were on-site for a total of 15 weeks.
The passenger and goods hoists provided by Sunbelt Rentals Hoists enabled our operatives to get into the slipform rig safely and efficiently during the slipforming phase of this landmark development in Manchester.Niall Donnelly, Project Manager, MPB Structures